How Thick Should a Concrete Slab Be?

Most slabs around a house are 4 inches thick. Driveways that carry heavy trucks, and pads under heavy equipment, go to 5 or 6 inches. Here is how to choose, what the building code says, and what each extra inch adds in concrete and cost.

Quick answer by project

ProjectTypical thicknessNotes
Patio, walkway, shed base, AC pad4 inThe usual choice for light, spread-out loads.
Driveway, passenger cars and SUVs4 inConcrete Network and QUIKRETE both give 4 in as enough for cars.
Driveway with trucks, RVs or heavy vehicles5–6 inSame sources; heavier loads need the extra depth.
Garage or house floor slabat least 3.5 in by codeThe residential code minimum; many builders pour 4 in or more.
Hot tub or heavy equipment padper the makerUse the thickness and reinforcement the installation guide gives.

What the building code says

The International Residential Code, which most US towns adopt in some form, sets a minimum of 3.5 inches for a concrete floor slab on the ground, and possibly more on expansive or difficult soils. It also calls for a 4 inch base of clean sand, gravel or crushed stone under slabs that sit below grade, and a vapor retarder under floors that will be heated. Driveways, walks and patios that won't be enclosed are exempt from the vapor retarder. Your local building department has the final word, so check before you pour anything structural.

Thicker edges where the load is

Slab edges carry wheel loads with less soil support around them. Concrete Network notes that contractors often thicken driveway edges by 1–2 inches, tapering back over about 4–8 inches from the edge. If you do that, add the thickened edge as its own part in the calculator so the extra concrete is counted.

What each extra inch costs

Concrete is ordered by volume, so thickness drives quantity directly. For a 12 × 20 ft slab with 10% extra:

ThicknessCubic yards80 lb bagsReady-mix at $125/yd³
3.5 in2.85129$356
4 in3.26147$407
5 in4.07184$509
6 in4.89220$611

Going from 4 to 6 inches uses half as much concrete again. Installed prices rise too: This Old House puts the average at about $5 per square foot for a 4 inch slab and $6 for 6 inches.

The form-board trap

Lumber is sold by nominal size. A 2×4 is actually 3½ inches tall and a 2×6 is 5½ inches. A "4 inch" slab formed with 2×4s set on the ground comes out at 3½ inches unless the forms sit higher or the base is dug deeper. Decide the real thickness first, then enter that number when you work out the concrete.

Joints scale with thickness

Control joints let a slab crack in a straight line where you choose. The Portland Cement Association's rule of thumb is to space them at about twice the slab thickness, in feet, when the stone in the mix is under ¾ inch:

Slab thicknessJoint spacing
4 inabout 8 ft
5 inabout 10 ft
6 inabout 12 ft

Checklist before you decide